This scope of this project was to tear off the existing roof including the insulation right to the decking. We started off with a power broom to sweep all the gravel to one side. Next we brought out our roof cutter to cut squares of the existing roof for easy removal. After the existing insulation was removed, we swept the existing steel decking.
This is where we installed the new 3.3 inch insulation board, once fastened we start our 3 layer process. Protectoboard, 3mm Base sheet and 4mm Cap sheet. Another happy client with their commercial flat roof!