The Scope of this project was to install our trusted 3 Layer system. The difficulty with this project was getting our material to the top. Each of the 25 rolls were had lifted up by hand due to the access we had, along with the 20 sq. ft protectoboard.
We installed Safety rails along the rear of the building, as well as replacing some of the flashing that was damaged and missing. “They don’t make them like the used to” with regard to the construction of the building. The slope of the roof is perfect, every joist was sloped & designed to get the water into the drain. So we didn’t want to disrupt that. So we added a 1″ insulation board to the roof for added thickness.
Happy to be involved in this project!