by Mike Van Houdt | Mar 30, 2018
The Scope of this project was to install our trusted 3 Layer system. The difficulty with this project was getting our material to the top. Each of the 25 rolls were had lifted up by hand due to the access we had, along with the 20 sq. ft protectoboard. We installed...
by Mike Van Houdt | Mar 30, 2018
This was a typical roofing project. A new owner to bought a 150 year old building with its original roof! except…it was hidden under 6 other roofs! This property always had a leak, no matter how many times it was patched. There was no question a full tear off...
by Mike Van Houdt | Mar 30, 2018
The client was having leaks and wanted a long term solution. We went to diagnose the roof and it needed a full replacement due to age. We installed safety rails after removing the aluminum flashing. After retrofitting a new drain, we installed our 3 layer system for a...
by Mike Van Houdt | Mar 30, 2018
This scope of this project was to tear off the existing roof including the insulation right to the decking. We started off with a power broom to sweep all the gravel to one side. Next we brought out our roof cutter to cut squares of the existing roof for easy removal....
by Mike Van Houdt | Mar 30, 2018
This was a 4000 sq ft garage with the exiting roof for over 50 years! This one had no life left and was patched a few hundred times. We purchased the building and are in the process of converting it into our Headquarters. It was one original building and had 2...